top of page
image.png
Lab Testing

High-Performance Lab Testing, Built for Speed

The Difference is in the Process:

Sierra Geotech’s labs are not a catch-all for every test imaginable. Instead, we follow a streamlined, high-output approach that ensures:

The Right Tests, Not All Tests

We focus on lab tests that matter most to client productivity.

A Prioritized Workflow

High-impact tests are fast-tracked to prevent project delays.

Strategic Outsourcing

Specialized tests that don’t hinder progress are outsourced or scheduled for later.

Fast Production, Quality Testing 

Like a precision-driven assembly line, every sample moves efficiently through the lab.

image (1).png

The Tests That Matter – Our High-Priority Lab Services

We focus on key material tests that directly impact construction productivity:

Soil Testing

Moisture Content, Atterberg Limits, R-Value, Proctor Compaction, etc.

Concrete Testing

I'm a paragraph. Click here to add your own text and edit me. It's easy.

Asphalt (HMA) Testing

I'm a paragraph. Click here to add your own text and edit me. It's easy.

Aggregate Testing

I'm a paragraph. Click here to add your own text and edit me. It's easy.

Steel Testing

I'm a paragraph. Click here to add your own text and edit me. It's easy.

Why Sierra Geotech? – Lab Testing Built for Construction Schedules

Sierra Geotech

AI + Human Intelligence

A perfect balance of smart automation & expert decision-making.

Instant Data Transmission

Test results don’t sit in a notebook—they move instantly.

Real-Time Coordination

Field, Lab, and Client are always in sync—zero miscommunication.

Continuous Evolution

Our system learns, adapts, and gets even faster.

VS

Traditional Slow-paced Lab Operations.

AI + Human Intelligence

A perfect balance of smart automation & expert decision-making.

Instant Data Transmission

Test results don’t sit in a notebook—they move instantly.

Real-Time Coordination

Field, Lab, and Client are always in sync—zero miscommunication.

Continuous Evolution

Our system learns, adapts, and gets even faster.

How We Make Lab Testing Work for Clients:

 If a test is critical for production: We complete it immediately to avoid delays.

If a test is specialized but not urgent: We outsource it or schedule it for later.

If a test doesn’t affect productivity: We keep it off the priority queue.

Let’s Generate Random Reports

The Construction-First Mindset – Lab Testing That Keeps Projects Moving

In construction, time is money.

A single delayed lab test can hold up thousands of dollars in contractor production, leading to costly downtime, stalled crews, and missed deadlines. At Sierra Geotech, we operate with a Construction-First Mindset—ensuring that lab testing supports, not hinders, progress.
We don’t just process samples. We keep construction moving.

Every second a test is delayed, a contractor loses money.

24-hour delay

$50,000+ in lost production.

48-hour delay

$50,000+ in lost production.

What Happens When a Lab Test is Late?

  • A concrete pour is delayed because compressive strength results aren’t ready.

  • Asphalt paving crews sit idle, waiting for a density test report.

  • A major highway project grinds to a halt because soil compaction data isn’t verified.

What This Costs Contractors:

  • Crew downtime – Thousands lost in labor costs

  • Equipment rental fees – Unused machinery burns money

  • Project delays – Deadlines slip, penalties increase

image (8).png

How Sierra Geotech Keeps Construction Moving

Test Results Prioritized for Project Schedules

If a test directly impacts construction, it’s moved to the front of the queue.

AI-Powered Lab Efficiency

Our system detects critical tests and fast-tracks them automatically.

Seamless Field-to-Lab Communication

No missing details. No back-and-forth. Every test is processed with precision.

Strategic Outsourcing for Non-Critical Tests

Specialized tests that don’t impact productivity are either scheduled for later or outsourced, so they don’t slow down the construction schedule.

The Red Flag System – Prioritizing the Most Critical Tests

At Sierra Geotech, we categorize tests based on their impact on construction schedules.

Tests That Directly Affect Construction Progress – Always Prioritized

  • Concrete Cylinder Breaks – Required before pours continue.

  • Asphalt Core Density – Determines if paving can proceed.

  • Soil Compaction Results – Must be verified before earthwork moves forward.

image (10).png

Tests That Are Important, But Not Time-Sensitive

  • Specialized concrete testing (e.g., shrinkage, modulus of elasticity).

  • Non-urgent aggregate testing (e.g., soundness, absorption rates).

image (11).png

Tests That Do Not Impact Production – Scheduled for Later

  • Long-term research testing

  • Non-urgent structural evaluations

How Fast Are We? See the Data for Yourself

Test Type

Concrete Cylinder Breaks

Asphalt Core Density

Soil Compaction

Industry Standard Turnaround

Concrete Cylinder Breaks

Asphalt Core Density

Soil Compaction

Sierra Geotech Turnaround

Same-day results

Next-day results

Same-day results

Why Our Turnaround Times MatteR

 Faster decision-making = Faster construction.

No delays, no bottlenecks—just immediate, actionable data.

Need Results Fast?
We've Got You Covered

Sed ut perspiciatis unde omnis iste natus error sit voluptatem accusantium doloremque laudantium, totam rem aperiam, eaque ipsa quae ab illo 

image (8).png

Subscribe to our Newsletter

Quicklinks
Dispatching
Field Testing
Lab Testing
Reporting
About Us
Contact Us
320 N 10th St, Suite 106
Sacramento, CA 95811
4470 Yankee Hill Rd #110
Rocklin, CA 95677
916.243.7078
Follow Our Social Media
©Sierra Geotech.
Privacy Policy
Terms of Service
Cookies Settings
bottom of page