Search
  • Sierra Geotech

Port of Long Beach on full speed!

Updated: Sep 11, 2019

Absolutely thrilled to see Port of Long Beach proceed full speed with The Pier B On-Dock Rail Support Facility Project. The engineering design work and program management is now proceeding and they have assembled a stellar team. Congratulations HDR Engineering, Inc. and their team of sub-consultants. This project when completed will be a full-service staging area for storing, sorting and assembling trains up to 10,000 feet long. The project cost is $870 million and the rail facility will be about 171 acres. Download the full fact sheet here: http://www.polb.com/civica/filebank/blobdload.asp?BlobID=13686



©2019 by Sierra Geotech.